Client :
Larsen & Toubro
Owner :
Kahramaa
Location :
Ain Khalid
Road Crossing of 1,093mtrs length by HDD Method for 220kV/ 515MVA double circuit cable line. Type H: Drilling and Installation of 4-250mmØ + 2-110mmØ HDPE Pipe (SDR 17, PN10) in single bore from Ain Khalid Substation to Al Waab Substation.