HDD Works - GTC/956B/2019 Qatar Power Transmission System for Facility E Power Evacuation Pckg S-1,


Client : Larsen & Toubro
Owner : Kahramaa
Location : Ain Khalid

Road Crossing of 1,093mtrs length by HDD Method for 220kV/ 515MVA double circuit cable line. Type H: Drilling and Installation of 4-250mmØ + 2-110mmØ HDPE Pipe (SDR 17, PN10) in single bore from Ain Khalid Substation to Al Waab Substation.