Project No. 280202100 – EPIC for GW Phase 1-QP - Ground Water Drainage System in Mesaieed


Client : Metito Overseas Qatar
Owner : Qatar Energy
Location : Mesaieed

Carrying out the Ground Water Drainage line thru Horizontal Directional Drilling(HDD) by drilling, backreaming, pipe pulling and Installation of 630mmØ HDPE pipes(SDR 11, PN16) in 800mmØ bore hole for total road crossing length of 296.50mtrs, 710mmØ HDPE pipes(SDR 11, PN16) in 900mm bore hole for total crossing length of 512mtrs and 450mmØ DHPE pipes(SDR 11, PN16) in 600mm bore hole in 650mtrs length.