CONTRACT FLOW DIVERT FROM PS 21 (NEW) TO PS 13


Client : ASHGHAL
Owner : ASHGHAL
Location : Qatar

Interception of existing PS21 (new) Rising Al Bustan Street to discharge Point (existing manhole) located at Al Amir Street. The temporary rising main is 2 kilometers length consist of shallow open trench & open cut works.