Client :
ASHGHAL
Owner :
ASHGHAL
Location :
Qatar
Interception of existing PS21 (new) Rising Al Bustan Street to discharge Point (existing manhole) located at Al Amir Street. The temporary rising main is 2 kilometers length consist of shallow open trench & open cut works.