Qatar Petroleum Project - EPIC for Potable Water Supply


Client : MEDGULF CONSTRUCTION
Owner : ASHGHAL
Location : Umm Bab, Jaleha and Khatiyah North, Qatar

Drilling and Installation of 50mmØ HDPE Pipe Encased in 110mmØ HDPE + 2-110mmØ HDPE Pipe (SDR17, PN10) in Single Bore 300mmØ – 9 Crossings

Drilling and Installation of 110mmØ HDPE Pipe Encased in 200mmØ HDPE + 2-110mmØ HDPE Pipe (SDR17, PN10) in Single Bore 450mmØ – 5 Crossings

Drilling and Installation of 200mmØ DI Pipe Encased in 500mmØ HDPE + 2-110mmØ HDPE (SDR17, PN10) in Single Bore 600mmØ – 5 Crossings

Drilling and Installation of 250mmØ DI Pipe Encased in 630mmØ HDPE + 2-110mmØ HDPE (SDR17, PN10) in Single Bore 800mmØ – 1 Crossing

Drilling and Installation of 500mmØ DI Pipe Encased in 900mmØ HDPE + 2-110mmØ HDPE (SDR17, PN10) in Single Bore 1050mmØ – 2 Crossings