The management of STA. CLARA INTERNATIONAL CORPORATION (one of the leading construction company in the Philippines) decided to expand its business operations in overseas (Gulf Region), that the management strategically established its first international branch in the Middle East particularly in Doha Qatar that was named “Sta. Clara International Co. W.L.L.”.
GTC/14/2006D & GTC/22/2004 QATAR POWER TRANSMISSION SYSTEM EXPANSION – HDD WORKS
Client: CEPCO
Owner: KAHRAMAA
GTC/22/2004 QATAR POWER TRANSMISSION SYSTEM EXPANSION – HDD WORKS
Client: MITSUBISHI CORPORATION
Owner: KAHRAMAA
RLOC EP2 PIPE LINE PROJECT - 14” MULTI PRODUCT PIPELINE FOR QP REFINERY – HDD WORKS
Client: PUNJ LLOYD
Owner: QATAR PETROLEUM
GC09106100 PROJECT EPIC FOR 16” JET A1 FUEL PIPELINE FROM BSV-3 TO NDIA – HDD WORKS
Client: DOHA PETROLEUM
Owner: QATAR PETROLEUM
ERC 1400/D20/C2 - INDUSTRIAL INTERCHANGE, PACKAGE 3 – CIVIL WORKS
Client: KONSTRUKTOR ENGINEERING
Owner: ASHGHAL
EPIC FOR NATURAL GAS SUPPLY TO IPP AL UDIED AIR BASE – HDD WORKS
Client: AYTB
Owner: QATAR PETROLEUM
FLOW DIVERT FROM PS 21 (NEW) TO PS 13 – CIVIL & HDD WORKS
Client: ASHGHAL
GTC/429/2011 EHV XMPE Cable – CIVIL WORKS
Client: SAUDI CABLE
Owner: KAHRAMAA
FLOW ASSURANCE PROJECT ONSHORE EPC2 AT RAS LAFFAN – HDD WORKS
Client: MEDGULF CONSTRUCTION
Owner: RASGAS
CP08-A-03: ENABLING WORKS QETAIFAN ISLAND – HDD WORKS
Client: AL JABER ENGINEERING
Owner: QATARI DIAR
SACON SUBMARINE CABLE SYSTEM – HDD WORKS
Client: E-MARINE
Owner: HUAWEI
LUSAIL DEVELOPMENT PRIMARY INFRASTRUCTURE CP24 PROJECT - HDD WORKS
Client: LARSEN & TOUBRO LTD.
Owner: LUSAIL REAL ESTATE DEVELOPMENT COMPANY / KAHRAMAA